TY - JOUR
T1 - Consideration of Multi-Objective Stochastic Optimization in Inter-Annual Optimization Scheduling of Cascade Hydropower Stations
AU - Jia, Jun
AU - Zhang, Guangming
AU - Zhou, Xiaoxiong
AU - Zhu, Mingxiang
AU - Shi, Zhihan
AU - Lv, Xiaodong
N1 - Publisher Copyright:
© 2024 by the authors.
PY - 2024/2
Y1 - 2024/2
N2 - There exists a temporal and spatial coupling effect among the hydropower units in cascade hydropower stations which constitutes a complex planning problem. Researching the multi-objective optimization scheduling of cascade hydropower stations under various spatiotemporal inflow impacts is of significant importance. Previous studies have typically only focused on the economic dispatch issues of cascade hydropower stations, with little attention given to their coupling mechanism models and the uncertainty impacts of inflows. Firstly, this paper establishes a coupled optimization scheduling model for cascade hydropower stations and elaborates on the operational mechanism of cascade hydropower stations. Secondly, according to the needs of actual scenarios, two types of optimization objectives are set, considering both the supply adequacy and peak-shaving capacity as indicators, with the total residual load and the peak-valley difference of the residual load as comprehensive optimization objectives. Subsequently, considering the uncertainty impact of the inflow side, a stochastic optimization model for inflow is established based on a normal distribution probability. Finally, case study analyses demonstrate that the proposed model not only effectively achieves supply stability but also reduces the peak-valley difference in load, and can achieve optimized scheduling under the uncertain environment of inflow.
AB - There exists a temporal and spatial coupling effect among the hydropower units in cascade hydropower stations which constitutes a complex planning problem. Researching the multi-objective optimization scheduling of cascade hydropower stations under various spatiotemporal inflow impacts is of significant importance. Previous studies have typically only focused on the economic dispatch issues of cascade hydropower stations, with little attention given to their coupling mechanism models and the uncertainty impacts of inflows. Firstly, this paper establishes a coupled optimization scheduling model for cascade hydropower stations and elaborates on the operational mechanism of cascade hydropower stations. Secondly, according to the needs of actual scenarios, two types of optimization objectives are set, considering both the supply adequacy and peak-shaving capacity as indicators, with the total residual load and the peak-valley difference of the residual load as comprehensive optimization objectives. Subsequently, considering the uncertainty impact of the inflow side, a stochastic optimization model for inflow is established based on a normal distribution probability. Finally, case study analyses demonstrate that the proposed model not only effectively achieves supply stability but also reduces the peak-valley difference in load, and can achieve optimized scheduling under the uncertain environment of inflow.
KW - cascade hydropower stations
KW - inflow impact
KW - mixed-integer programming
KW - multi-objective optimization
KW - stochastic optimization
KW - temporal correlation
UR - http://www.scopus.com/inward/record.url?scp=85185704331&partnerID=8YFLogxK
U2 - 10.3390/en17040772
DO - 10.3390/en17040772
M3 - 文章
AN - SCOPUS:85185704331
SN - 1996-1073
VL - 17
JO - Energies
JF - Energies
IS - 4
M1 - 772
ER -