摘要
In this study, high-belite Portland cement clinker was successfully prepared by using low-grade limestone and solid-waste calcium carbide slag and steel slag, achieving resource utilization while reducing CO2 emissions caused by raw materials decomposition in the cement industry. Using X-ray diffraction, microscopic images, thermogravimetric analysis, and differential scanning calorimetry, the physicochemical reaction process, phase composition, and microscopy of clinker were studied. The results indicated that the high-belite Portland cement clinker can be successfully produced at 1340 °C for 1 h with a belite content of 58.6% and an alite content of 24.2% when the composition of raw material was suitable. Meanwhile, the content of high-reactive-phase α-C2S can reach 1.4%. Via microscopic viewing, C2S and C3S were interphase distributed and well developed. In this study, the CO2 emission of the prepared high-belite Portland cement clinker was 54.67% lower than that of ordinary Portland cement clinker. All the above results confirm that high-belite Portland cement clinker can be produced using low-grade limestone and solid wastes, which can significantly reduce CO2 emission during Portland clinker production and promote an innovative approach to the cement industry.
源语言 | 英语 |
---|---|
文章编号 | 2641 |
期刊 | Materials |
卷 | 18 |
期 | 11 |
DOI | |
出版状态 | 已出版 - 6月 2025 |